|

God Bless America















Click For
Verbal Welcome
Quick Links

| |
Victoria Mortgage Corporation
Senior Vice President, Management Information Systems,
1992 - 1995
Irvine, CA
|
|
Recruited to this $1.2 billion mortgage bank as member of
the Executive Management Team by the Managing Director and co-founder / owner of
this joint venture between the Managing Director and Western Bank to assist in
positioning the division for sale or merger. On time completion of my initial
objectives contributed to the division being sold in October 1993. Shortly
thereafter, rapidly deteriorating economic conditions and a failed second merger
forced the firm to downsize 75%. Reorganization included drastic reductions in
MIS investment negating, by the Managing Director’s reluctant acceptance of my
recommendation, the need for my position. Shortly thereafter, I was re-hired as
consultant to drive rapid re-expansion of branch network. Victoria Mortgage
collapsed in early 1996.
Scope of Responsibility:
Directed mainframe, mid-range and microcomputer
application development, computer operations, LAN / WAN networks, voice
systems, hardware / software acquisitions, and data center capacity /
contingency planning. Managed 28 staff and $2.1 million budget.
Accomplishments:
-
Developed and implemented
Strategic Automation Plan integrating AS/400's, microcomputers an LAN / WAN
networks, reducing technical problems by more than 96% while
increasing productivity of corporate work force by an average of 5%.
-
Enabled merger of Western Bank Mortgage and Victoria Mortgage Corp., providing Warehouse Inventory and Wire Transfer systems to monitor $10 million of daily bank borrowings and the
ability to fund loans using electronic funds transfer.
-
Re-structured MIS Department, increasing
productivity by more than 300% while reducing missed deadlines from 50+% to less than
3%.
-
Managed project to customize licensed Residential Loan
Origination/Secondary Marketing System, implementing system supporting more
than 120 staff in 19 geographic locations originating annually $1.25 billion
of government and conventional mortgages.
-
Analyzed, selected and implemented Residential
Mortgage Qualification System, reducing time required for 120 Loan Officers to qualify
mortgage client from 2-4 hours to 10 minutes.
-
Converted ACCPAC Accounting System to AS/400 based
JD Edwards Accounting System, enabling consolidation of accounting
functions saving annually $100,000 and improving efficiency of month-end
close 100%.
-
Managed development of mortgage origination Quality Control Tracking System,
eliminating 95% of
manual effort to track quality control exceptions, realizing
annual savings in excess of $25,000.
-
Developed automated interface between the Residential Loan
Origination and Loan Servicing Systems, eliminating manual effort required to
perform new loan setup on Loan Servicing system, saving annually more than
$40,000.
-
Developed automated interface between the Residential Loan
Origination and General Ledger Systems, eliminating manual effort to post
journal vouchers to General Ledger System, saving annually more than $85,000.
-
Designed and managed development of client / server based MIS Project
Management System, providing ability to track and prioritize on-going backlog
of 300 to 400 projects as well as monitor daily progress on projects
assigned to MIS staff, reducing implementation delays 65%.
-
Opened 12 offices in 12 weeks,
acquiring and implementing networks, computers, and voice systems, expanding
branch network 80%.
-
Enabled application / systems interoperability,
designing and implementing frame relay network supporting two data
centers and 18 branch offices,
reducing annual WAN expenses by $30,000.
-
Established microcomputer training program,
increasing computer related productivity
and efficiency of 260 employees by an average of 50%.
-
Instituted in-house technical support for PBX
systems, reducing
out-of-pocket expense for maintenance 95%, saving annually more than $37,000.
-
Instituted in-house cable management program,
designing and implementing voice and data cable management
system, eliminating out-of-pocket maintenance costs, saving annually more than $30,000.
-
Generated funds required to upgrade technical
infrastructure, negotiating refinance of IT assets, increasing working
capital by $1.3 million. More
Detail
-
Improved office productivity, re-engineering 220 node corporate
LAN, improving network reliability / availability from 56% to 99.5%.
-
Upgraded AS/400 operating
environment to support 350% growth in six months, increasing service level to
99.8% while reducing response time to less than 1 second.
-
Negotiated national account status for acquisition of
PBX systems, reducing costs 20% in first three months of program, saving
$10,000.
-
Managed design and build-out of 36,000 sq. ft. corporate facility,
coordinated architects, equipment vendors, contractors and space planners,
bringing project in on-time and under $1.2 million budget.
-
Designed and managed construction of 1,200 sq. ft. data center,
coordinated architects, equipment vendors, contractors and space planners.
Improved security and IT operations efficiency 200%.
-
Negotiated
$400,000 microcomputer lease, acquiring higher performance equipment, saving more than $40,000 and reducing maintenance expense to $0.
-
Directed installation of 16 peer-to-peer WAN / LAN
networks, enabling implementation of Residential Loan Origination / Secondary
Marketing System plus general office systems / software for more than 120
staff.
-
Managed relocation of corporate office and data canter
including AS/400, MiTel PBX/Voice Mail System, 150+ microcomputers and more than 400
associated office / system devices, relocating 260 staff over 1 weekend without
interruption to business functions.
|